# Question on how deep some cuts go in Maslow videos

**URL:** <https://forums.maslowcnc.com/t/question-on-how-deep-some-cuts-go-in-maslow-videos/4186>\
**Category:** No Judgement\
**Created:** [June 1, 2018, 8:10am UTC](https://forums.maslowcnc.com/t/question-on-how-deep-some-cuts-go-in-maslow-videos/4186 "2018-06-01T08:10:54Z")\
**Posts on this page:** 1\
**Showing post:** 8

<div class="post-metadata">

**Author:** ![KingOfScolboa](https://yyz1.discourse-cdn.com/flex031/user_avatar/forums.maslowcnc.com/kingofscolboa/32/2438_2.png) [@KingOfScolboa](https://forums.maslowcnc.com/u/KingOfScolboa)\
**Post date:** [June 2, 2018, 11:09am UTC](https://forums.maslowcnc.com/t/question-on-how-deep-some-cuts-go-in-maslow-videos/4186/8 "2018-06-02T11:09:08Z")

</div>

For a full sheet I would remove the top layers back to the spoil board then place the new board on top.

You might also want to consider at this point a modification I’ve seen others make where they add a skirt around the board so that the sled doesn’t topple in the absolute extreme edges of the full 8 x 4 foot area. Obviously this isn’t an issue working in the 4 x 3 foot zone.

More info here…

> [@80 Dollar, 60 minute Frame Build aka 80/60](https://forums.maslowcnc.com/t/80-dollar-60-minute-frame-build-aka-80-60/2249?source_topic_id=2259):
>
> I’m going to name my design “the $80 build” Less than 90 minutes with Documenting - I will say it will be under 60 minutes. Screw count 9 - This is a minimum build but I believe it will work. It’s designed to mount the work to the frame and have it flush with the outer edges for full access to the entire sheet. 2- 12 ft boards 1 - 10 ft board 1 - 8 ft board 1 sheet of wood . 3/4 inch thick Note there are 2 side pieces and 12 screws not in place. The top mount is deviated from the drawing…

---

_[View the full topic](https://forums.maslowcnc.com/t/question-on-how-deep-some-cuts-go-in-maslow-videos/4186)._