Im in the process of assembling and was thinking about lasercutting 2 rings per arm from 0.5mm plexi - one for guiding the belt onto its spool and one to shim the additional height.
Tried to visualize it with this illustration, hopefully clear enough.
As I dont have assembled my maslow yet, I dont know: am I running in some other troubles with this, are there more position that require shims for additional height?
Thanks for your thoghts and answers in advance!