Throwing my hat in the sled modification ring

a couple ways

  1. connect the fixed chain at the same distance from the bit as the moving one

  2. lie to the machine about the chain position :slight_smile:

    since each link is 1/4", if your fixed chain is 1" further out than the moving
    one, move it 4 links further out when you start paying it out.

1 Like