Here is a log of my setup experience so far.
| Date | Approx Time Spent | Micro Summary |
|---|---|---|
| Dec 7 | 3.0 hrs | Initial Maslow build/assembly. |
| Dec 8 | 3.75 hrs | First calibration attempts, anchor layout, got Maslow on home Wi-Fi. |
| Dec 9 | 9.75 hrs | REAT/REAP cycles, 7×7 calibration, Z-height confusion, first test cuts in plywood and foam. |
| Dec 10 | 5.5 hrs | Coaching with Nate, foam test cuts, Z-home mistakes (through spoilboard/floor), pentagon test, belt break. |
| Dec 11 | 0.5 hrs | Forum research / learning. |
| Dec 17 | 4.75 hrs | New belts, rebuild, calibration, Trace Boundary crash off corner, figured out height/geometry issue, new anchor plan. |
| Dec 18 | 5.75 hrs | Built 4" anchors, multiple calibration retries, anchor reinforcement, retract-all bug, center deviation error. |
Details per day:
Daily Time Summary
| Date | Approx Time Spent | Micro Summary |
|---|---|---|
| Dec 7 | 3.0 hrs | Initial Maslow build/assembly. |
| Dec 8 | 3.75 hrs | First serious calibration attempts, anchor layout, got Maslow on home Wi-Fi. |
| Dec 9 | 9.75 hrs | REAT/REAP cycles, 7×7 calibration, Z-height confusion, first real test cuts in plywood and foam. |
| Dec 10 | 5.5 hrs | Coaching with Nate, foam cutting tests, Z-home mistakes (through spoilboard/floor), pentagon test cut, busted a belt. |
| Dec 11 | ~0.5 hr | Forum research / learning. |
| Dec 17 | 4.75 hrs | Install new belts, rebuild/reassemble, successful calibration attempt, trace-boundary crash off bottom-right, geometry/height insight and plan to change anchors. |
| Dec 18 | ~5.75 hrs | Build 4" anchors, multiple calibration retries, anchor reinforcement, retract-all weirdness, center point deviation error, recalibration in progress. |
Per-Day Micro Log (Condensed)
Dec 7
- ~3 hours building and assembling the Maslow.
Dec 8
-
2:50 PM – Found Maslow still calibrating from overnight; restarted calibration.
-
Set up Maslow on home Wi-Fi.
-
3:07 PM – Used Find Anchor Locations (2000 mm × 1000 mm, 9×9 horizontal).
-
3:29 PM – Followed DLang’s advice: no full recal, just retract/extend/apply tension (REAT).
-
6:22 PM – On forum troubleshooting failed calibration.
-
6:31 PM – Retracting, measuring extend distance (120"), starting calibration.
Dec 9
-
10:50 AM – On forum, updating values in FluidNC config.
-
11:03 AM – Starting REAT.
-
11:11 AM – Maslow error; posted to forum.
-
11:36 AM – Fixed init issue; REAPing.
-
1:25 PM – Started 7×7 calibration (per Bar).
-
1:54 PM – Noticed Z height “2 cm” during calibration; confusion.
-
2:16 PM – Realized that “2 cm” was visible thread at bottomed-out Z; restarted 7×7 after retract/extend.
-
4:30 PM – 7×7 calibration finished; checked for obstructions; planned forum post.
-
5:35 PM – Ran Trace Boundary twice, posted about Z height, sent first G-code (no bit), planned 8’ line/L-shape test.
-
7:00 PM – Found Z-height issue: left in the button pusher used for bit swaps. Created 1" square test in Inkscape; generated G-code; REAP requested.
-
7:11 PM – REAP done; started first cut.
-
8:36 PM – Happy with nice test cuts on plywood and foam.
Dec 10
-
3:30 PM – Changed bit and REAPed.
-
4:00 PM – Coaching session with Nate (Google Meet): reviewed workspace, triangle plan, and G-code strategy.
-
5:49 PM – Posted to forum: Maslow won’t get “ready to cut” with foam under it (possible height issue).
-
7:00 PM – Cut another 1" test square in 1.5" foam (good); previous run cut through spoilboard and into floor due to not re-setting Z home for new surface/bit.
-
7:01 PM – Planned another test: random shape (pentagon in Krabz with a tab).
-
7:09 PM – New cut started, sounded too deep, paused; system didn’t recover → power cycle.
-
7:25 PM – Adjusted bit deeper into router per forum suggestion (more shank in collet).
-
8:57 PM – Posted to forum: busted a belt by jogging 22 mm from bottom-left home. Considering smaller frame to avoid this. Plan: order new belt, partial disassembly, re-belt, reassemble, recalibrate. Good news: pentagon cut looks clean, no burning, just some Z inaccuracy getting all the way through.
Dec 11
- 5:10 PM – Back on the forum asking questions and learning.
Dec 17
-
12:30–2:10 PM – New belts arrived; worked on installing/rebuilding Maslow.
-
3:30–5:10 PM – Continued building/reassembly.
-
5:15 PM – Plugged in, tried lowering Z; noted for user guide: set Z before calibration.
-
5:48 PM – Extended all belts; started calibration.
-
6:00 PM – Calibration going well; confirmed Z all the way down (no bit) and 2" foam on spoilboard.
-
6:37 PM – Trace Boundary looked good onscreen, but in reality sled ran toward bottom-right corner, tried to go off edge, opposing belt hit 100% tension, red light, forced REAP.
-
Later – Tinkered with foam alignment and realized high Z + 2" foam + ¾" spoilboard makes belts very tight near edges. Decided to raise anchors and move them inward a few inches, then recalibrate.
Dec 18
-
11:00 AM – Started work; built updated 4" tall anchors for 2" bit + 2" foam.
-
Multiple calibration restarts: once with bit still in; others due to weak anchors needing reinforcement.
-
2:52 PM – Started another calibration; plan to add bit afterward and test spoilboard alignment.
-
3:25 PM – Calibration finished; jogging to edge showed wheelie near left edge; got center point deviation error and “belt lengths unknown / not ready to move” messages.
-
3:48 PM – Retracting all; bug where only two belts retract. Repeatedly hit Retract All, belts retracting in small increments.
-
~3:50 PM – Restarted and tried retract again.
-
4:37 PM – Added side braces to L-shaped anchors to remove flex at top of 4" anchor (no flex now); retracting and recalibrating.
-
4:51 PM – Added another screw to back of anchor to prevent lifting; started calibration again.