Hello everybody,
so i just got my maslow, thank you to the whole team behind maslow!
During assembly I came now to an issue with the linear rod clamps.
The inner diameter on the down side is different between the clamps, one has 16mm and the other one 14,5mm. The smaller one simply can not be installed as i can not push it over the clamp arms on the sled. As this deviation is completely out of any tolerances for injection molding parts am I missing something here?
I tested out any combination of clamps, sled position and rods but it doesn’t fit.
Does anybody else had this issue?
Thank you!